Its gotten cold so we've started using our fab new Nestor Martin (model IT33) woodburning stove.
liz and steve's renovation adventure
Once these were in, and the frame for the folding sliding doors installed, Dain returned to finished the ground floor rendering. Rendering done, Jon jumped on the folding sliding doors this week and bingo! What a difference!
With the floor up, one of those big mixer lorries turned up and the guys barrowed the mix round the back and in. The driver even had the audacity to say to Jon that he would charge waiting time if they ran over 20 mins. You can only guess what Jon made of that suggestion!
One of the big differences between Jon and the guys and the 'bastards' we had before, although whilst it was an additional cost, the guys got it done and dusted in no time and it just wasn't stressfull at all compared to what the 'bastards' put us thorugh in no.4. Thanks guys!
Elsewhere, doorways got new lintels . . .
. . . Sean (I'm just too good looking) built us a nice brick pier to support the steel holding up the new dormer (the very steel that only needed to be the width of the kitche, but the pillocks who put it in (see 'bastards') put it in the whole length of the two cottages! When we revealed just how tight they had got this end, only an inch on to the end brick wall (hence needing extra suppoer with the pier), Jon commented 'the bastards only just managed to get it on this end, but had 9m too much the other side!' . . .
. . . and then some walls got boarded, some got stripped and UPVA treated, and . . .
Well, things just dont stand still here! No sooner have we vacated no.3 and are still unpacking in no.4, the guys begin ripping out no.3! First off the kitchen, bathroom and utility room are knocked into one and the back opened up for the folding, sliding doors.
This is what the back looked like a month ago . . .
And from the inside . . .
Above you get first sight of the change in ceiling height in the new kitchen and the three velux roof windows.
With ripping out complete, downstairs Sean and Ging start knocking out new doorways, inserting lintels and making good the door surrounds.
Below, the upstairs (Matt and Kev) is cracking on at pace too with walls ripped out, doorways crated and stud walls already going up. Oh, and the sparkies have already begun first fix! Bloody hell!
Below, the third skip of the week is soon filling up with bricks and rubble and the pile of timber and other waste awaits the next skip.
Recycling is high on our list, so the guys are allowed to salvage what they want - copper piping, cabling etc, and Danny the sparky took our old back door away with him for his own house.
Below, Liz's desk view is also across the front garden and fen.
Below, the new lounge window view across the fen.
The bedroom and bathroom look east over the back garden and fen. A view which will be much improved when we get rid of the 'village' of sheds we inherited when we bought no.4.
Once the stairs had gone in the carpets could go down. Jon also fitted the oak window sills throughout.
One of three zebrano Jaga Knockonwood radiators in the living room.
And Steve arrived back on Thursday evening and from Friday (26 Sept) we spent three days switching from no.3 to no.4! We're knackered!! Once we have things resembling some order we can resume the decorating. Only the office got completed before the move. Here's a few photos of sorting to be done.