Age: c.21
Job: general builder - chippy, bricky, etc (see Ging), and being simply too good looking to be real
Oh, and did I mention he is good looking? Not sure about the face furniture though.
liz and steve's renovation adventure
Inside, we've been slogging away ourselves with the never-ending decorating. We got all the base coats slapped on and we began to slap on the top coats.
And here is what we are using - ECOS organic paint. Organic paint! Great stuff. And it don't cost the earth either, around 5% more than top end Dulux/Crown stuff and cheaper than your fancy dan Fired Earth or Farrow & Ball slap. We found them whilst searching fthe web or eco-paint and then found that they are also rated by my beloced Which? Top stuff! Below, Liz slaps on the 'citrica' in the bathroom which ties in with the orange in the border tiles. Wait til you see the other colours we've bought!
Like our new oak floor? Niiiiiiiice!
Above, the smart new back door at the end of the covered approach. It will open into the new bot room which leads in to the new kitchen (both phase 2).
Above, the new bathroom window, with floating mullions, with a great view across the fen. The new (ungrouted) tiles also on view.
Below, we've been busy too - decorating! The last two weekends and every weekday night for the last two weeks we've been slogging our own dear little backsides. And boy, there's a lot of prep to do when you are doing a house from scratch. Upstairs is ready for final coats and downstairs base coats are going on.
Matt (left), Kev (centre) and Jon install the first of the gable end windows. Oh - it was a tight fit. Needed persuasion, as they say in the trade!
Above, both sets of gable end windows are in! Wow! And this is what it used to look like!
This is what things look like from the inside -

Above, the lounge. Below, the office, showing well the view over the adjacent open farmland. You'll notice that in the office skirts and architraves are in, Matt's been busy installing the new oak internal doors and we've even started painting!

Below, a view of the house from the field behind us. The boared windows behind no.3 will be installed in phase two during the autumn. This also gives a great view of the new rear roof - how flat does that look! You can just make out the roof window of the sunpipe to the right of the wee flue top at the left hand end. And . . . the new first floor extension has been weatherboarded! Don't it look fab!

Above, Kev has been busy slating the canopy and boot room/kitchen roof.
And below, Matt finished the installing the Velux sunpipe at the top of the stairs where there is no other natural night other than what ambient light comes up the stairwell from downstairs.


Back inside, another major event was the installation of the new woodburning stove in the lounge.

We said goodbye to Josh today who starts his a new teaching job in London. Good luck Josh and thanks.
Above and below, the new canopy joins the boot room and Jon has built the boot room/kitchen roof, complete with four Velux roof windows (one over the boot room, three over the new kitchen). The canopy and boot room/kitchen roof are now ready for slating (but Matt and Kev are busy elsewhere on the house!).
Phil the plumber has been in and done first fix and Jon has started preparing the weatherboarding (below) for the first floor extension.
Bootroom progress Jon (upper) and Josh (lower) crack on with the gables of the bootroom. Its a dusty old job cutting up them blocks!
Jon's handywork at the end of the day. Very neat!
Oak postsThe three oak posts for our rear canopy (a covered walkway running the length of the back of the house from the garage end to the back door) arrived today. You could smell them from miles away, a lovely sweet, fresh cut smell. And they each weigh a ton!
One nice new roof
Matt and Kev finished the main new roof section - don't it look just sweet! Just a wee bit of work on the gable edge before they move on to . . . roofing the bootroom and the canopy!
Boot room mk. 2! The frame and brick piers left by the cowboys got ripped up. A nice new concrete (sorry, we had to use some somewhere!) floor poured in, a new timber inner frame and a nice course of blockwork (which will later be rendered). Jon's been a busy boy here! And Josh just kept on mixing those mixes and clearing up others' mess! Note the outside brew station on the block.
Sunpipe!